Skip to content
Register with us as an M/WBE Enquire Now
Toggle High Contrast Mode
Enable High Contrast Mode
Disable High Contrast Mode
Arold Construction
  • Home
  • About
    • History
    • Our Team
    • Our Services
    • Our Clients
    • Contact Us
  • Projects
    • Trenchless Projects
    • Civil Projects
    • Water and Wastewater Projects
  • Civil
    • Heavy Highway
    • Bridges
    • Water/Sewer Treatment
    • Utilities
  • Trenchless
    • CCTV Inspections & Cleaning
    • Cured in Place Pipe (CIPP)
    • Centri-Pipe (CCCP)
    • AltLiner Structural Fiberglass Manhole Lining
    • Primus Water, Sewer & Gas Lining
  • Safety
  • M/WBE
  • Links
  • Employment
facebook tiktok
Toggle Menu
Toggle High Contrast Mode
Enable High Contrast Mode
Disable High Contrast Mode
Register with us as an M/WBE Enquire Now
facebook tiktok
  • Home
  • About
    • History
    • Our Team
    • Our Services
    • Our Clients
    • Contact Us
  • Projects
    • Trenchless Projects
    • Civil Projects
    • Water and Wastewater Projects
  • Civil
    • Heavy Highway
    • Bridges
    • Water/Sewer Treatment
    • Utilities
  • Trenchless
    • CCTV Inspections & Cleaning
    • Cured in Place Pipe (CIPP)
    • Centri-Pipe (CCCP)
    • AltLiner Structural Fiberglass Manhole Lining
    • Primus Water, Sewer & Gas Lining
  • Safety
  • M/WBE
  • Links
  • Employment
Primus Line Installation
 

Primus Line Installation at IBM Fishkill

March 21, 2019

Read More

Truck with large blue tarp coming out of the back
 

D261954 I87 Small Culvert Repair

March 21, 2019

Read More

Construction vehicle entering park avenue tunnel
 

Park Avenue Tunnel Inspection Manhattan

March 21, 2019

Read More

Construction worker standing inside of large pipe entrance
 

D262702 Large Culvert Repair Syracuse, NY

March 21, 2019

Read More

Construction worker working underground
 

Tomhannock Dam Outlet CentriPipe Rehab

March 21, 2019

Read More

1 2 3

ENQUIRE NOW


WE ARE LICENSED IN

Icons of NY, NJ, PA, CT, MA, VT

© 2021 Arold Construction Co. Inc.
51 Powder Mill Bridge Rd.
Kingston, NY 12401

p: (845) 336-8753
f: (845) 336-8245

facebook tiktok

Accessibility Statement
Site: KDD

QUALITY

We take pride in every job we complete large or small and stand behind everything we do. To us quality means more than just suppling the best, most cost efficient products but installing them the proper way so they last.

SAFETY

For over 40 years, Arold Construction has been receiving safety awards for our safety program. We strive to make our jobsite the safest possible to reduce risk of injury or death to our employeees, clients, or the general public.

INNOVATION

We strive to bring new products to the area that not only reduce costs but also reduce or even in some cases eliminate disruption to the general public. We are constantly looking into new technology an evaluating it to see if it is a fit for the northeast.

 
 
Close